DDC / Projects
§ 04 — Selected work

Six recent jobs, measured in deliverables.

Every job closes with an as-built packet, a certification report, and a key handed over. Here are six that capture what we do on a given week.

Showing6 of 500+ Span2022 — 2025 Sectors7 verticals ReferencesOn request
PJ-024Q3 · 2025
Healthcare · Fiber backbone

Regional hospital fiber backbone — 22 buildings, 18 miles OS2.

A regional health system needed to retire a patchwork of leased circuits and tie 22 buildings — main hospital, clinics, admin, and an outlying campus — onto a dedicated fiber backbone. We bored under two state highways, ran aerial on their easement, spliced a 96-count OS2 into building entrances, and certified every strand.

Outcome: 18 mi OS2 backbone delivered on schedule. Zero downtime on clinical networks during cutover.
Scope
Fiber backbone
Buildings
22
Fiber
96-ct OS2
Distance
18.4 mi
Splices
864
Location
N. Wisconsin
Duration
16 weeks
Standards
TIA-568, 942
PJ-023Q2 · 2025
Education · Cat6A refresh

K-12 district-wide Cat6A refresh — 9 schools, 4,200 drops.

Eleven weeks to retire aging Cat5e infrastructure across an entire K-12 district and install 4,200 new Cat6A drops, refresh every IDF, and certify the whole plant. Summer-window work. Crews split across nine buildings, with a shared logistics yard.

Outcome: 4,200 drops terminated and Fluke-certified. E-Rate documentation packet filed on time. District opened day one.
Scope
Full refresh
Schools
9
Drops
4,200
Cable
Cat6A U/FTP
IDFs
27 refreshed
Program
E-Rate
Location
Central WI
Duration
11 weeks
PJ-022Q4 · 2024
Manufacturing · IIoT retrofit

Manufacturing plant IIoT retrofit — 650k sq ft, live floor.

Shielded Cat6A pulled to every major machine on an operating plant floor — 48 drop locations, cable tray above machinery, IP camera drops, and industrial Ethernet switches at cabinets throughout the facility. Scheduled around production: second-shift weekend work.

Outcome: Zero lost production hours. Plant data-collection and IP camera coverage live in 14 weeks.
Scope
IIoT cabling
Area
650,000 sq ft
Cable
Shielded Cat6A
Drops
194
Cameras
62 IP
Location
Fox Valley, WI
Duration
14 weeks
Shift
2nd / weekend
PJ-021Q3 · 2024
Data center · MPO build-out

Colocation cabinet build-out — 48 cabinets, 1,152 LC terminations.

Edge colocation provider needed 48 new cabinets built out with overhead fiber runway, MPO-24 trunks back to the meet-me room, and 1,152 LC terminations fanned out at the cabinet. Live-floor work with hot-aisle discipline throughout.

Outcome: 100% pass on bi-directional OTDR certification. Cabinets available for tenant install two days ahead of schedule.
Scope
Cabinet build-out
Cabinets
48
Trunks
MPO-24 × 96
Terminations
1,152 LC
Fiber
OM4
Location
Chicagoland
Duration
6 weeks
Standards
TIA-942
PJ-020Q2 · 2024
Government · Municipal I-Net

Municipal fiber I-Net — downtown ring, public safety priority.

City Department of Public Works project: a self-healing fiber ring connecting city hall, the public safety building, public works, and five traffic signal cabinets. Horizontal directional drilling under two arterials, permitting coordination, and prevailing-wage certified payroll throughout.

Outcome: 4.8 mi OS2 ring commissioned. Public safety and traffic cabinets now on dedicated city fiber.
Scope
Muni fiber ring
Distance
4.8 mi
Nodes
8
HDD bores
2 arterials
Fiber
48-ct OS2
Payroll
WH-347
Location
Wisconsin city
Duration
9 weeks
PJ-019Q1 · 2024
Retail · Multi-site rollout

Multi-state retail rollout — 47 locations, one spec.

A national specialty retailer refreshed every store across a 47-site footprint: new POS cabling, back-of-house Wi-Fi APs, and MDF consolidation. One drawing package, one bill of materials, one method-of-procedure — replicated store by store across 14 states.

Outcome: All 47 sites cut over on schedule. PCI scope reduced via VLAN segmentation. Zero call-backs in 90-day warranty window.
Scope
Retail rollout
Sites
47
States
14
Drops / site
~24
Cable
Cat6
APs / site
4-6
Duration
20 weeks
Install window
Overnight
§ 04.1 — References

What the other side of the job says.

Three voices from three sectors.

They pulled 4,200 drops in an eleven-week summer window. Every one terminated, tested, and labeled. We opened school on day one.
District Director of IT K-12 · Central WI · 2025
We gave them a 96-count OS2 schedule and a clinical network they could not touch. They handed back a certification packet and a network that came up clean.
VP Infrastructure Regional health system · 2025
Forty-seven stores, fourteen states, not one call-back inside the warranty window. That is unusual.
Director of Retail Ops National specialty retailer · 2024
Want to talk to one of these customers?

References on request.

We're happy to put you on the phone with someone who has just finished a job like yours. Say so in the quote request and we'll line it up.

Request a reference